Week 43 – Fireplace!

It’s been a few weeks since the last post since work slowed down for the holidays and freezing temperatures.

A visit to the house today showed work continuing with all the plumbing and electrical. We also weren’t expecting to have the gas fireplace roughed in.

img_0133

The waterproof membrane has been installed on the deck outside the upstairs master bedroom.

img_0135

Now that the holiday season is over, we expect work to pick up again. Next meeting is with the audio visual contractor to discuss speaker and data drops throughout the house.