Week 40 – Moving right along

The house has been wrapped before the exterior finishes are started.

img_2397img_2398

They have also started the installation of the flat roof material.

img_2402

Inside all in the internal systems continue to be fleshed out including electrical wiring.

img_2399

img_2403

Akash’s bathroom is coming together with the shower niche framed out.

img_2404

For the exterior, some of the bricks are onsite to start looking at the brick coursing.

img_2401

The roof/fascia color was chosen using Berridge Matte Black on the left.

IMG_0227

Things are moving right along. I expect things will slow down toward the end of December with the holidays, but good progress continues to be made.

 

Week 38 – Plumbing and HVAC

Between Thanksgiving and work, I had to skip a week’s post. The crew have been busy continuing the plumbing and now have started all the duct runs for the HVAC.

The roof is full of duct work.

img_2371img_2370

Lots of parts for the vents.img_2364

More progress has been made on the fireplace masonry work.

img_2365

They even have Akash’s bathtub place.

img_2363

When I drove by Sunday afternoon they were still hard at work so slowly but surely this house is coming together.