Week 114 – We have a bridge!

After almost two months of non-stop rain, the weather finally cooperated and the bridge over the creek bed was finally poured. Here is the finished forms waiting on the concrete to show up.

img_2893img_2896

Pour has started.

img_2897

Finishing up.

img_2898img_2904

It is such a relief to get this done. It was causing access issues to the house to finish up the final interior and exterior items.

The bridge didn’t cause all work to cease. The steel work painting continued.

img_2894img_2895

The upstairs deck was completed including the stairs down to the upper landing area.

img_2900

Landscaping work should start next week now that trucks have access. The interior AV work also continues to get wifi, cameras, and sound systems integrated.

Week 113 – Rain Rain Go Away

The rain has really been slowing down progress on the exterior items. Some progress has been made on the bridge but it is slow going.

img_2816

The floating steps look great and are almost done.

img_2809

Fence work continues.

img_2812

On the inside, we have mirrors in the powder and guest room.

img_2810img_2811

The deck railing continues and is about half way done.

img_2805

Smarter Homes has started all the AV work.

img_2807

I’m keeping my fingers crossed that the bridge can be finished up this week in between the rain which is in the forecast for at least the next week.