The floating steps leading up to the front door are finally finished.
Next steps are the steel planters that will surround them. The posts have been installed to attache the steel.
The garage floor has been installed.
The sewer line has been re-attached now that the bridge is done.
Washer and dryer have also been delivered and installed.