We’ve had a lot of rain in the past two weeks that has slowed down the new bridge over the dry creek. It is finally getting formed up and will hopefully get poured next week.
Luckily it hasn’t slowed down the floating front steps.
The staircase railing wood has been added and it really looks amazing.
The vent hood cover was finally installed and was really the last item in the kitchen remaining.
The sliding barn doors to the storage area has also been installed.
Landscaping will also start next week depending on the weather. More rain is in the forecast so we will be fighting that as we try and get this house finished.