Week 116 – Front Planters

The steel for the planters around the front steps are going in. In addition to looking good, they are necessary for safety so there is less than a three foot drop around the stairs.

img_2978img_2969img_2970img_2976

The barn door to the storage room have been painted.

img_2971

The window tinting has been applied to key windows in the master baths.

img_2974img_2973

A mirror has been added to the upstairs master closet.

img_2975

Week 112 – Steps and Stairs

We’ve had a lot of rain in the past two weeks that has slowed down the new bridge over the dry creek. It is finally getting formed up and will hopefully get poured next week.

Luckily it hasn’t slowed down the floating front steps.

img_2743

The staircase railing wood has been added and it really looks amazing.

img_2746img_2745

The vent hood cover was finally installed and was really the last item in the kitchen remaining.

img_2747

The sliding barn doors to the storage area has also been installed.

img_2744

Landscaping will also start next week depending on the weather. More rain is in the forecast so we will be fighting that as we try and get this house finished.

Week 110 – Rain

After  a long stretch of dry weather, Austin had a large amount of rain which has put a damper on the new bridge. This is a video just after the rain storm. You can see the water flowing quickly in the creek bed.

This is a few days later. The water is not as high but still flowing.

img_2634

The install for the upper deck has started and is almost complete.

img_2639img_2643

On the interior, installation of the wood on the staircase has begun. The wood and steel combination really looks great.

img_2655img_2656img_2657

We have more rain in the forecast today but hopefully less than half and inch and it is supposed to be a fast moving storm. We need it to dry out to get this bridge complete.

Week 108 – Steel Work

The steel work has started in the house for both the interior and exterior. On the inside, the fireplace wrapping is installed.

img_2360

The staircase railing has also started.

img_2363

On the exterior, the planters and trellis installing on the roof top deck has also started.

img_2366img_2368

In addition, lots of other general progress. The garage door has been installed.

img_2306

The footing for the staircase leading up to the front door has also started.

img_2307

We should be tracking for completion no later than end of April. We can’t wait to move in!

Week 100 – Stairs

The floating staircases were encased with wood this week.

The stair lighting was also installed.

img_1975

Light fixtures continue to be installed. Here is the pendant in the guest house.

img_1971

The tub in the upstairs master in finally in place.

img_1974

All the AC units continue to be installed and hooked up.

img_1970

It also seemed like electricity was on at least partially in the house as a lot of the lights worked. All the smoke detectors were installed as well and I don’t know if they put batteries in right before the move in date, but they were all chirping.