Week 60 – Skylight!

The skylight has been installed in the second story family area and it really brightened the room considerably.

img_0388

Here is a picture of the front of the house now that the windows are installed.

img_0390

We had a brief scare today when we discovered that Akash’s bathtub was full of water after two days of significant rain, but figured out pretty quickly they were doing a tub fill test. All the shower pans were also full of water. If all this passes, the plumbing should pass inspection and the electrical was inspected last week. If all goes well, the drywall will start in the next 10-14 days.

Week 58 – Windows Continue

This house has lots of windows so the installation will continue for the next few weeks. They started the windows that overlook the property on the first floor, and it is going to be impressive when complete.

img_0290

The exterior brick appears to have started but I’m not sure if this small area was just a test run to confirm mortar color and brick pattern. Either way, the dark brick with matching mortar really looks great.

img_0289