Week 62 – Inspection Time

Things have been quite around the house as inspections are going on which will allow us to move on to insulation and drywall.

The door to the outdoor patio is installed which is quite impressive as part of the overall window package.

img_0442

The brick coursing has also been nailed down in this sample area.

img_0441