Week 58 – More Windows!

The window installation continues but should wrap up by the end of the week. All the windows in the main living area have been installed.

img_0312img_0316

The downstairs master is also complete in the bed room and the sitting area.img_0314img_0313

As a bonus, the tub for the upstairs master is also here.

img_0317