Week 110 – Bridge Prep

The existing bridge over the dry creek bed is being removed and replaced to allow water to flow more freely during large rain events. The initial work has been started to pour the footings and then the bridge will be removed.

img_2599

Landscaping and grading continue. The planters have been filled with rock for drainage.

img_2602

The upper terrace continues to be graded and soil brought in. Holes have been dug for the fruit trees.

img_2605

Here is a shot showing the bed around the back of the garage where the citrus trees will go.

img_2607

The screen door has been installed on the patio.

img_2609

The wine cooler has also been installed in the pantry which was the last major appliance.

img_2608

We may get some much needed rain today, but next week should be dry and will allow the entry steps to be poured as well as the bridge.

 

Author: karcuri13

After many years wanting to start my very own hive, I'm finally taking the plunge and setting up my first urban hive in April.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: