The existing bridge over the dry creek bed is being removed and replaced to allow water to flow more freely during large rain events. The initial work has been started to pour the footings and then the bridge will be removed.
Landscaping and grading continue. The planters have been filled with rock for drainage.
The upper terrace continues to be graded and soil brought in. Holes have been dug for the fruit trees.
Here is a shot showing the bed around the back of the garage where the citrus trees will go.
The screen door has been installed on the patio.
The wine cooler has also been installed in the pantry which was the last major appliance.
We may get some much needed rain today, but next week should be dry and will allow the entry steps to be poured as well as the bridge.