Week 79 – Paint and Cabinets

The exterior is almost wrapped up. The stucco and fascia has been painted.

img_0986img_0983img_0984img_0988

On the interior, all the cabinets have been delivered and are now being installed.

img_0981img_0982

Things are moving right along, and we are starting to see the light at the end of the tunnel.