Week 63 – Concrete Floors Finished

In between inspections, the flooring company came in to finish the concrete floors and then cover to protect them for the rest of the construction process.

img_0466

Insulation and drywall is next on the list. It will really be interesting to see the walls get closed up after we’ve seen them so long exposed.