I haven’t posted in a few weeks as the work going on as mainly been cabinet finish out and that doesn’t make for any great pictures.
Painting prep is now in full swing and the house is all taped up and being primed. The MDF wall that goes up all the way to the 2nd floor is primed.
All the windows are being taped up to protect from any paint.
All the drawers are being removed to prime for painting.
Another shot of window protection and all cabinet drawers off for painting.
Painting will continue for the next few weeks. It is a long process, but I’m looking forward to seeing the end results.