The upper part of the driveway has cured and looks great.
The wood is being installed over the fireplace.
All the glass has been installed in the bathrooms.
The stove finally arrived has been installed.
It also looks like the garage door has been installed but since it was left open I didn’t want to try closing it in case it wasn’t final yet.
The wood floors are also being prepped for finishing so that will start next week as well.