Week 9 – Walls getting closer

It appears the rain last week prevented the walls from being poured. There is now a large trench from the back of the lot which I’m assuming is there to help the water drain. 

Here is the north wall with the water proofing and drainage system. 
Here is the west wall with the final form on meaning the steel was inspected. This will be the storage room foundation that ties into the retaining wall. The trench leads up to this area so I’m assuming this back area was too wet to get formed up for the pour. Another shot of the west wall. Shot of trench from storage area looking toward the front of the lot. 

Author: karcuri13

After many years wanting to start my very own hive, I'm finally taking the plunge and setting up my first urban hive in April.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: