Week 99 – Plumbing Fixtures

This week we saw a lot of plumbing fixtures being installed.

The sink and faucet in the powder room.

img_1871

The shower fixtures in the downstairs master.img_1874

Shower fixtures in the upstairs master.img_1879

Light fixtures installed in the upstairs master. Mirrors are being fabricated.img_1880

Kitchen sink fixture.img_1872

Toilets are also being installed in all the bathrooms.img_1875

Light fixtures are also being installed but a lot are still wrapped in plastic. Here is the one in our master closet.

img_1881

On the exteriors, the ceiling heaters have been installed in the screened patio area.

img_1873

Gutters and downspouts are also being installed.

img_1882

The hope is to get the electricity turned on in the next week and also start the auto-court pavers. Cork flooring is also going into the kitchen and maybe even appliances.

Author: karcuri13

After many years wanting to start my very own hive, I'm finally taking the plunge and setting up my first urban hive in April.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: