Lots of incremental progress at the house. The kitchen backsplash had grout applied.
The upstairs master bathroom tile is down and waiting on grout.
Here is Gitanjali and our builder picking grout colors.
Hardwood floors is pretty much done. Here is the upstairs master closet.
Upstairs master bedroom.
The outdoor kitchen had the black granite counter top applied with matching sink.
If it ever stops raining long enough for the soil to dry out, the black granite backsplash piece will also be installed.
The next two weeks should get all the floors finished along with the staircase including the cork in the kitchen. We should also get final electrical inspection so we can turn on power to the house and get heat and AC working.