Week 106 – Bathroom Glass

The upper part of the driveway has cured and looks great.

img_2276

The wood is being installed over the fireplace.

img_2279

All the glass has been installed in the bathrooms.

img_2277img_2283img_2281img_2282img_2284

The stove finally arrived has been installed.

img_2280

It also looks like the garage door has been installed but since it was left open I didn’t want to try closing it in case it wasn’t final yet.

The wood floors are also being prepped for finishing so that will start next week as well.