Week 6 – Retaining Wall Steel

The rain has stopped and work is progressing again. When I arrived on Saturday, I was greeted by this sign.

IMG_1156

I also noticed we had a new water meter box since our original one was crushed by the rig used to drive in the piles.

IMG_1157

At the top of the site, all the structural steel for the retaining walls was almost complete.

fullsizeoutput_514afullsizeoutput_514c

These will be some pretty beefy retaining walls since they are right up against our neighbors property line as well as along the back of the lot. There was a crew there finishing up all the steel, and they are on track to pour them on Monday. If I’m able, I may try and swing by and get some video of the pump truck pouring the footings.

Author: karcuri13

After many years wanting to start my very own hive, I'm finally taking the plunge and setting up my first urban hive in April.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s