Week 29 – Second Floor Decking

Subtle progress has been made since last week and the first floor framing was filled out and the second floor decking was started.

Decking has been added to the second floor area in prep for framing.

img_1859

Here is a shot from the upper terrace that more clearly shows the decking.

img_1863

Here is the view that shows the entire footprint.

img_1839

Next week should be more of the same as they complete the decking over the garage and start the framing on the second story. We do have rain in the forecast mid-week so there might be some rain delays.