Week 31 – Second Floor Framing

I essentially took a week off from posting as the rainy weather minimized the noticeable progress. The rain ended early this week and the framing crew were able to make good progress on the second floor.

You can start to see the roof outlines of the second floor as seen from the drive.

img_1979

From the upper terrace, almost all the decking is complete on what will be the deck over the garage looking into the upstairs master suite.

img_1981

You can really get a sense of the entire structure now that most of the second floor is framed out.

img_1983

Here is a shot from the other side of the upper terrace.

img_1984

If the weather continues to cooperate, all the framing should be complete in the next two to three weeks.

Author: karcuri13

After many years wanting to start my very own hive, I'm finally taking the plunge and setting up my first urban hive in April.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: